Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

No Information to Display

400 2nd St

New Construction, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

400 2nd St, Snohomish, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Averill Field Improvements - Phase I The City of Snohomish is seeking a contractor to furnish all labor, materials, and equipment necessary to construct the park improvements in the City of Snohomish as shown on the project plans and specified in the technical provisions. The Work to be performed under this contract provides for constructing a new playground area, sports courts, utility improvements, concrete walkway, lighting, plantings, and other Work necessary to complete the project as shown on project plans and specified in these technical provisions for the City of Snohomish, Snohomish County, Washington. Contract award will be made to the lowest, responsible, responsive bidder based on the total Base Bid. In addition to the Base Bid, the Owner, at their discretion, may choose to award Additive Alternate 1 and/or Alternate 2. Engineer’s Estimate Range: Base: $570,000 to $670,000 If the successful bidder does not enter into a contract and file a performance and payment bond and the required insurance certificates, with the City of Snohomish within ten (10) working days after Notice of Award of Bid, the amount of the bid deposit shall be forfeited to the City of Snohomish. Unsuccessful bidders' deposits will be returned upon City’s execution of contract documents or rejection of all bids. City of Snohomish Notice of Call for Bids Averill Field Park Phase I Improvement Project Page 2 of 124 A one hundred percent (100%) Contractor’s Performance and Payment Bond is required. The bond must be delivered to the Snohomish City Clerk within ten (10) working days after notification of the award to the successful bidder. The Bond must be approved by City officials before the contract award is final. The City of Snohomish reserves the right to reject any or all bids, and to waive irregularities or informalities in the bid or in the opening. The City of Snohomish reserves the right to delete portions of the work. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.