Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

March 11, 2024

920 W Capitol Ave

Site Work

No Information to Display

$120,000.00

Public - City

img_map_placeholder

920 W Capitol Ave, West Sacramento, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of West Sacramento is seeking bids to construct and install a security fence and gates at the City facility located at 920 West Capitol Ave in West Sacramento. As part of this project an ADA compliant ramp needs to be constructed to connect the office to the sidewalk. West Sacramento is a vibrant riverfront community centrally located in Northern California. West Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 53,000 people. The City is full-service with nine (9) departments and over 400 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. Question Deadline 07/20/2023 at 3:00 PM PT egend and Specificatons: A. Existng Office. B. Pour new ADA compliant concrete sidewalk to extend and match the existng walkway south to the sidewalk. C. New 6' tall x 18' wide wrought iron swing gate. 2"x6"x 1/4 " frame w/1"x1" spindles. Recommend Limaster 2100U Hinges or equivalent. Heavy duty electric gate opener. Recommend Limaster CSW24 UL or equivalent. D. 3 ea. New 6"x6"x8'x1/4" wall tubing posts w/ 24" imbedded in 18"d x 30" deep concrete base. E. New 6"x6"x9'x3/8" wall tubing posts w/ 30" imbedded in 18"d x 30" deep concrete base. F. Card Reader location: Limaster EL200SS RFID Card Reader with audio, video and light to office. Install Knox Rapid Access Device. G. New 42" wrought iron walk in gate. Card Reader entry with camera and audio function into office. H. Two New 6' tall wrought iron fence secons. 2"x6"x 1/4 " frame w/1"x1" spindles. Approx length 12' each. I. Existng walkway. Construction Notes: Saw Cut asphalt pavement prior to trenching. Line voltage run in separate conduit. Low voltage, video, audio, and control can be run in same conduit. 120v for batery recharge and post light can be pulled from existing electrical in office. All posts to have welded cap. Installation Notes: Client has a security system installed. Bid to include providing compatble camera at entrance post and man gate with coax cable to office. The EL2000 Card Reader has the Versa XS 4 management software

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects