Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 20, 2023

August 21, 2023

December 11, 2023

8650 17 St NW

Demolition, Site Work

No Information to Display

$185,880.00

Public - State/Provincial

img_map_placeholder

8650 17 St NW, Edmonton, AB

Subscribe to View Full Documents

Strathcona Science Provincial Park Pod Building and Entrance Sign Demolition. Work of this Contract comprises the following: .1 Prime Contractor responsibilities. .2 Project management and coordination. .3 Safeguarding of Work areas. .4 Environmental requirements. .5 Removal and disposal to approved disposal sites of hazardous materials identified in the documents and encountered during the course of the Work. .6 Location, disconnection and capping of utilities. .7 Septic Tank: location, disconnection, removal, disposal to approved disposal site, and backfill. .8 Fire hydrants: disconnection, thrust block installation, removal, disposal to approved disposal site, and backfill. .9 Meter vault: removal, disposal to approved disposal site, and backfill of the meter vault. New water connection. .10 Pod building: removal and disposal to approved disposal site of the complete structure, foundation, floors, roof, walls, mechanical, electrical, lighting, communications, all debris inside and adjacent to the work site and backfill. .11 Entrance sign and light: removal, disposal to approved disposal site and backfill. Temporary sign to be returned to Alberta Parks Representative. Light standard to remain. If power service is connected to entry feature light, disconnect and connect the power service to the light standard to the north. .12 Benches and picnic tables: removal and disposal to approved disposal site. Retain and protect pad. .13 Signs and flag poles: removal, disposal to approved disposal site and backfill. Above ground interpretive sign infrastructure to be returned to Alberta Parks Representative. .14 Site restoration, topsoil and seed. .15 Miscellaneous and related works.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.