Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 18, 2023

No Information to Display

900 Greenwood Ave

Addition

No Information to Display

No Information to Display

Public - City

img_map_placeholder

900 Greenwood Ave, Monroe, MI

Subscribe to View Full Documents

Plans call for a 4,921 square-foot addition of an existing maintenance building. Bidders are encouraged to submit questions to the Architect no later than Monday, July 10, 2023. Greenwood Maintenance Building Addition for Monroe Housing Commission Greenwood Townhouses 900 Greenwood Avenue, Monroe, MI 48162 The Monroe Housing Commission is undertaking a Maintenance Building Addition for the Greenwood Townhouses Complex located at 900 Greenwood Avenue, Monroe, MI 48162. Initial funding will be through the Implementation of the 2022 Capital Fund Program for the Greenwood Maintenance Building Addition. In general, the drawings propose the Addition to the Maintenance Garage, New Associated Parking and Site Improvements located within the Greenwood Townhouse Complex. The Addition consists of an Expansion of the Maintenance Building, New Community Center Space, Library, and Public Safety Substation adding approximately 3,202 square feet to the existing 3,530 square foot SingleStory, Slab-On-Grade, Wood Framed Structure with Vinyl Siding, and Shingled Roof used for the current Maintenance Building. The intention of the Addition is to serve the Tenants of the Greenwood Townhouses. The only proposed Interior Improvements being undertaken within the Existing Structure will be to integrate the new Mechanical System located within the Addition into the existing northeast side of the existing Maintenance Building. Exterior Improvements include Roof Replacement, New Siding, and Exterior Building Lighting.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects