Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 25, 2023

June 26, 2025

7380 E Willow St

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

7380 E Willow St, Long Beach, CA

Subscribe to View Full Documents

Leo J. Vander Lans AWTF SCADA Upgrade Project - Electrical Contractor The Project consists of furnishing all labor, materials, equipment, supplies and incidentals required to upgrade the plant SCADA system to modernize and standardize the hardware and software. The work generally includes, but is not limited to, upgrades of the existing PLC hardware from Schneider Electric Modicon Quantum PLCs to M580 PLCs, modernization of the PLC software, upgrades of the backup power for the control system hardware, upgrades of the thermal management for all control panels, upgrades of the SCADA network architecture including the plant fiber optic network and upgrades to the SCADA application. All these upgrades will provide improved reliability and thereby improved plant operation. Questions Due Date: Jul 14th 2023, 10:00 AM PDT Intent to Bid Due Date: Jul 25th 2023, 11:00 AM PDT must be accompanied by a certified check drawn on a solvent bank, payable to the WRD, for an amount equal to ten percent (10%) of the total maximum amount Bid A bond in the sum of one hundred percent (100%) of the Contract price shall be furnished, guaranteeing the faithful performance of said Contract, and a bond in the sum of one hundred percent (100%) of the Contract price shall be furnished for the protection of all laborers and materialmen.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects