Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

October 2, 2023

July 1, 2024

8228 Conant

Addition, Demolition, Renovation, Site Work

No Information to Display

$3,993,000.00

Public - State/Provincial

img_map_placeholder

8228 Conant, Detroit, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Oakland International Academy is seeking sealed bids for General Contractor services on a construction project for a 2-story, 17,766 square foot addition to the middle school building located at 8228 Conant Street. 1) Two story sprinkled addition 2) First story: 8,883 sq. ft. 3) Second story: 8,883 sq. ft. 4) Total additional square footage: 17,766 sq. ft. 5) Masonry Construction a. Brick on 8" block b. New brick veneer to match patterning and intent of existing structure c. Rigid insulation between brick air=space and block 6) Limited gypsum board on metal stud construction for some non-classroom function rooms 7) Addition Finishes to match existing finishes, dependent upon owner approval 8) (16) sixteen classrooms, (8) eight per floor 9) (2) two boys and (2) girls bathrooms, (3) three fixtures (sinks & water closets), (1) one per floor 10) (1) one elevator 11) (2) two stair towers 12) (1) teachers Lounge and Teacher's Restroom on second floor 13) Storage, Mechanical and electrical rooms Throughout 14) Mechanical a. (4) Four 12.5 ton units b. (2) Two 4 ton units c. System for addition independent of existing building d. Roof conductors and drains, feed directly to storm e. (2) two water heaters in Mechanical room first floor 15) Electrical a. New electric service to tie into existing service at Main Distribution Panel b. Each floor to have panels for floor c. System for addition independent of existing building 16) Plumbing a. New sanitary lead to tie into existing, contractor to verify exact size, location and flow of direction b. Hi-lo water fountain on each floor c. Service sink on second floor d. Fridge and sink in Teacher's Lounge e. Sprinkler line, domestic line and gas point of entry in Mechanical room (first floor) 17) Fire Alarm a. Per NFPA and Fire Alarm System Manufacturer. 18) Civil a. Site b. Landscape Work is to commence on August 7, 2023. Proposal must include a project timeline with completion by July 1, 2024 and a secured Certificate of Occupancy.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.