Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

January 15, 2024

November 14, 2025

4961 Dufferin St

Addition, Site Work

No Information to Display

$15,535,000.00

Public - State/Provincial

img_map_placeholder

4961 Dufferin St, Toronto, ON

Subscribe to View Full Documents

The University of Toronto is seeking responses to this RFP from pre-qualified Design-Builder teams for full services and work related to the design and construction of the University Toronto Library (UTL) Downsview High-Density Storage Expansion 2. This is an addition to an existing storage facility. Proposed area and space program: Proposed High-Bay Storage Room 2,242 sm Proposed one storey administrative/processing area 118 sm Proposed additional mechanical space 112 sm Gross Floor Area 2,515 gsm The project will consist of High Bay Storage area and a one-storey administrative/processing area. The proposed high density storage area shall form a single building envelope that shares a wall with the existing facility. The one-storey addition for processing area is anticipated to be an extension of the existing administrative area. Additional non-assignable spaces such as circulation, mechanical and electrical rooms may be required as part of the expansion. QA deadline 8/15/2023 Based on the design of the existing facilities, it is anticipated that the gross floor area required for the three bay expansion and the one-storey processing area would be approximately 2,515 gsm (including proposed mechanical space). The project's Design-Build Bid for work to be performed by the successful DB team shall not exceed $15,535,000 (excluding HST). Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline 2023/08/01 05:00:00 PM EDT

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.