Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 19, 2023

September 18, 2023

March 16, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Cottleville, MO

Subscribe to View Full Documents

**As of August 9, 2023, this project has not yet been awarded. The project is expected to be awarded approximately August 22nd.** Each separate bid must be accompanied by certified check or bank cashier's check payable to the Owner, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company meeting the requirements as referenced in the Instructions to Bidders in the amount of 10% of the bid. Such checks or bid bond will be returned to all except the three lowest bidders within ten days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract. The Owner reserves the right to reject all Bids; to reject any non-responsive Bid; to waive informalities in the Bids; and to determine the low, responsive, responsible Bid. The Owner reserves the right to award the project in a manner that is deemed by the Owner to be in the best interests of the Duckett Creek Sanitary District. The work includes, but is not limited to, installation of approximately 4,900 lineal feet of 8" force main using primarily trenchless (horizontal directional drilling) methods. Open cut installation will be allowed in some locations. Work also includes but is not limited to excavation, erosion control, site restoration, traffic control, and ancillary work as necessary for a complete and satisfactory project as shown on the Drawings and specified herein. The successful bidder will be required to agree that not less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract. The alignment follows Wyndgate Valley Drive, goes south on Paul Renaud Blvd, turns west on Diehr Rd, then crosses Grayleaf Ct to the southwest. CMT has indicated the sewer will likely be constructed with both cut and cover and jack and bore techniques. Duckett Creek Sanitary District Administrative Office, 3550 State Highway K, O'Fallon, Missouri 63368. Attendance at the pre-bid conference is highly recommended, but not mandatory The latest possible date to request clarification of any item related to this project Monday, July 17th at noon

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects