Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 31, 2024

No Information to Display

500 Sky Harbor Way

Site Work

No Information to Display

$3,000,000.00

Public - County

img_map_placeholder

500 Sky Harbor Way, Jefferson, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Jackson County is issuing a Request for Qualifications (RFQ) to engineering firms experienced in development of engineering plans, and construction and bid documents for infrastructure projects. The project will extend sewer service to the Jackson County Airport from a connection with the City of Jefferson sewer system, totaling approximately 1.5 miles. Responding firms should be technically qualified, licensed to provide these services, and experienced in the preparation of plans for infrastructure projects. Services to be provided will include preparation of a Preliminary Engineering Report (PER) and further design services if federal or state funding is awarded. Jackson County is considering applying for an Appalachian Regional Commission grant to assist with funding for the project. The project will involve the extension of sewer service to the Jackson County Airport from a connection with the City of Jefferson sewer system, at the lift station located off I.W. Davis Road near County Farm Road, totaling approximately 1.5 miles. The project will include a new gravity fed sewer line and improvements to an existing City of Jefferson lift station. As of August 17, 2023, per owner, an engineer has been selected. A construction timeline has not been identified.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.