Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

October 9, 2023

April 6, 2024

23110 Leonard Hall Dr

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

23110 Leonard Hall Dr, Leonardtown, MD

Subscribe to View Full Documents

MBE Participation (%) 10.00 PACKAGED ROOFTOP AHU REPLACEMENT The work shall be completed within 180 calendar days from the start date of the contract. If the work is not completed within the time period specified, the contractor will be liable for liquidated damages of $550.00 per calendar day as specified in the "General Conditions." Bid prices are irrevocable for a period of 120 days following bid opening. After opening bids, the Procurement Officer may request bidders to extend the time during which the State may accept their bids, provided that, with regard to bids, no other change is permitted. Prevailing wage rates apply to all contracts in the amount of $250,000 or more. Wage rates applicable to projects of $250,000 or more are attached to the specifications. The deadline for questions has been established as July 26, 2023 @ 2:00 p.m., to ensure that there is enough time to allow for the A/E to provide responses and possible Addendum issuance if necessary. All Questions must be submitted, in writing, to the Procurement Officer. Replace existing packaged rooftop units with packaged AHU's with matched capacity for cooling and configuration for dampers and airflow. o Contractor to Remove existing packaged Rooftop units. o Replace with new packaged rooftops with similar configurations. o Provide units with the latest refrigerant. o Provide new roof curb adaptors and coordinate with a roofing company for sealing and warranting for leaks during the warranty period. o Reconnect existing ductwork to new AHU's. o Reconnect and coordinate all electrical requirements for a fully functioning system. o Provide with packaged controls to meet the original configuration for dampers and sequence of operation. o The Contractor to coordinate and provide pricing for integration, reconnection to BMS of new AHU's controls and sequences with existing BMS. o Provide, install, and coordinate location of new thermostats for each AHU and its perspective zones. o Provide rebalancing of new AHUs to original design conditions. o The Contractor to provide a fully functioning system

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects