Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

November 27, 2023

June 24, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Denver, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

GH Phipps is working in conjunction with the City of Denver, Department of Transportation and Infrastructure to procure General Contractors for this ADA improvement project. The project includes correction of ADA non-compliant elements at the Red Rocks Amphitheatre including removal and replacement of the Top Circle Lot and Upper Ramp Walkway to the recently replaced upper Plaza; removal and replacement of the South Ramp Walkway and Shuttle Stop; removal and replacement of the existing Upper South Parking Lot and the creation of an additional Upper South Parking Lot; new restroom building between the new Upper South Parking Lots; new portable toilet enclosures at the Upper South Parking Lot and Top Circle Lot; removal and replacement of (2) two ramps at the Trading Post; replacement of accessible parking at the Trading Post and Box Office parking lots; new electrical gear at the Upper North Lot. The specific scopes includes site demo, earthwork, concrete paving, curb and gutter, concrete retaining walls, stone veneer, steel railings, bollards and gates, glulam roof structure, roofing, interior building finishes and toilet specialties, plumbing, electrical including new electrical gear, site lighting, asphalt paving and pavement markings, storm drainage, water and sewer services, site fences, guardrails and landscaping. The work in the various areas will be turned over phases based on the provided Phasing Plan and Preliminary Schedule with construction starting November 13, 2023. The Top Circle Lot, ramp and South Ramp Walkway are required to be turned over by March 29, 2024, prior to Easter sunrise services. The remainder of the work not adjacent to the Venue must be complete by June 10, 2024. Please see scoring criteria for more detail on selection process. As the City's best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.