Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 2, 2023
November 27, 2023
June 24, 2024
Multiple Locations
Paving, Site Work
No Information to Display
No Information to Display
Public - County
Multiple Locations, Denver, CO
Plans and Specifications are not available for this project. If that changes, they will be made available here.
GH Phipps is working in conjunction with the City of Denver, Department of Transportation and Infrastructure to procure General Contractors for this ADA improvement project. The project includes correction of ADA non-compliant elements at the Red Rocks Amphitheatre including removal and replacement of the Top Circle Lot and Upper Ramp Walkway to the recently replaced upper Plaza; removal and replacement of the South Ramp Walkway and Shuttle Stop; removal and replacement of the existing Upper South Parking Lot and the creation of an additional Upper South Parking Lot; new restroom building between the new Upper South Parking Lots; new portable toilet enclosures at the Upper South Parking Lot and Top Circle Lot; removal and replacement of (2) two ramps at the Trading Post; replacement of accessible parking at the Trading Post and Box Office parking lots; new electrical gear at the Upper North Lot. The specific scopes includes site demo, earthwork, concrete paving, curb and gutter, concrete retaining walls, stone veneer, steel railings, bollards and gates, glulam roof structure, roofing, interior building finishes and toilet specialties, plumbing, electrical including new electrical gear, site lighting, asphalt paving and pavement markings, storm drainage, water and sewer services, site fences, guardrails and landscaping. The work in the various areas will be turned over phases based on the provided Phasing Plan and Preliminary Schedule with construction starting November 13, 2023. The Top Circle Lot, ramp and South Ramp Walkway are required to be turned over by March 29, 2024, prior to Easter sunrise services. The remainder of the work not adjacent to the Venue must be complete by June 10, 2024. Please see scoring criteria for more detail on selection process. As the City's best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Denver, CO
Bid Date: Aug 03 2023
Denver, CO
Bid Date: Aug 03 2023
Denver, CO
Bid Date: Aug 17 2023
Denver, CO
Bid Date: Jun 23 2023
Denver, CO
--
Denver, CO
Bid Date: Aug 11 2023
Denver, CO
Bid Date: Aug 02 2023
Denver, CO
Bid Date: Aug 10 2023
Denver, CO
Bid Date: Aug 11 2023
Denver, CO
Bid Date: Aug 17 2023
Denver, CO
Bid Date: Aug 09 2023
Denver, CO
--
Denver, CO
--
Denver, CO
Bid Date: Sep 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
