Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 20, 2023
August 21, 2023
No Information to Display
Multiple Locations
Site Work
No Information to Display
No Information to Display
Public - City
Multiple Locations, Denver, CO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
SBE goal of fifteen percent (15%) for the work to be performed. All questions received during the Inquiry Period will be answered via Addendum 2 no later than 5:00pm Friday, July 14, 2023. a) The project is located on the Regional Transportation District's Central Light Rail Corridor and consists of a 90-degree curve crossing both 14th Street and California Street. b) The intent of this scope of work is to repair the existing light rail guideway at the intersection of 14th and California in downtown Denver. c) Work is to be completed on all track-way work within the consecutive calendar days agreed upon by CCD and RTD. It is anticipated that this project will take 10 calendar days depending on site conditions to complete with working hours of 7:00 am to 7:00 pm Monday - Friday and 8:00 - 4:00 on Saturday and Sunday. d) Protect all existing utilities in place. Contractor is responsible for calling UNCC and hiring private locate company to locate RTD and other utilities prior to construction. If necessary, potholing may be desired based on surface locates and will be paid for as incidental to the Work. Potholing shall be the responsibility of the Contractor. e) The Contractor is responsible for the demolition, removal and disposal of all material indicated in the contract drawings, including, but not limited to concrete pavement, concrete curb and gutter, concrete railroad ties, rail, and ballast. f) After the removal of the existing trackway, the Contractor shall survey any exposed conduits or subsurface infrastructure and include them on final As Built drawing set. g) The Contractor shall address any soil compaction issues or drainage issues found prior to building new trackway section. h) RTD will provide the Contractor all rail materials, inclusive of e-clips, rail pads, concrete ties, pre-curved running rail and restraining rail and flangeway fillers. See Contract Specification Section 01 64 00 - Owner-Furnished Materials for a complete list. i) The Contractor shall provide all survey work required to layout new track work both horizontally and vertically. j) The Contractor shall provide all labor, equipment and materials not indicated on the Owner Furnished Materials list to complete the project as shown in the Issued for Construction Drawings. k) Concrete pavement replacement between tracks is to be included in the LRT shutdown period. Concrete pavement replacement must be complete prior to removal of traffic control. Concrete pavement shall not be opened to traffic until CCD specified strength is attained. l) The reopening of 14th and California Streets is subject to the completion of work performed and accepted by RTD. m) The repair must be compliant with the Americans with Disabilities Act (ADA). n) Upon completion, the RTD Project Manager or his/her designee will inspect the work for compliance with the Issued for Construction Drawings. o) Any work done outside RTD ROW (i.e., in City and County of Denver (CCD) ROW) shall be completed using CCD specifications and standard details. Any street pavement, subgrade preparation or utility work on CCD streets shall be done in accordance with CCD specifications and standard details. p) The Contractor shall provide RTD as-built survey information related to the new trackway alignment, utilities uncovered during demolition, utility infrastructure moved during construction, etc. q) After construction is complete, but prior to removal of the site protective fencing and traffic control, RTD will inspect the new construction and sign off on the Certifiable Items List, generated by RTD prior to opening rail service. The Contractor shall immediately address any concerns identified during this inspection.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Denver, CO
--
Denver, CO
--
Denver, CO
Bid Date: Jul 31 2023
Denver, CO
Bid Date: Jul 01 2023
Denver, CO
Bid Date: Jun 01 2023
Denver, CO
Bid Date: Aug 16 2023
Denver, CO
Bid Date: Aug 09 2023
Denver, CO
Bid Date: Sep 01 2023
Denver, CO
Bid Date: Jul 26 2023
Denver, CO
--
Denver, CO
Bid Date: Jul 27 2023
Denver, CO
Bid Date: Aug 01 2023
Denver, CO
Bid Date: Aug 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
