Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 26, 2023

August 25, 2023

December 23, 2023

FL-20 & FL-45

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

FL-20 & FL-45, High Springs, FL

Subscribe to View Full Documents

Counties: Alachua, Lafayette Road Name: SR45 (US 41) AND SR 20 Limits: From End of Sidewalk to Nw 9th Rd and From Sw Community to Sw Virginia Circle Project(s): 43917715201(*) Federal Aid No: D223057B Project(s): 44612515201(*) Federal Aid No: D223080B Total Roadway Length: 0.625 Miles Contract Days: 120 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.625 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The Improvements under this Contract consist of sidewalk, drainage improvements, highway signing, and other incidental construction along SR 45 in Alachua County from end of sidewalk to NW 9th Rd and along SR 20 in Lafayette County from SW Community to SW Virginia Cir. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Sidewalk / Clearing and Grubbing / Drainage Improvements - SR 45 and SR 20

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects