Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

January 6, 2024

103 School St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

103 School St, Greer, SC

Subscribe to View Full Documents

Summary of Work The project generally consists of, but is not limited to, the following work: 1. Remove existing HVAC system and ductwork and install new all electric heat pump HVAC system including new ductwork, remove and replace water heater, upgrade electrical meter center and perform blower door testing. Each prime bidder must deposit with his bid security in the amount of 5 percent of the bid. Bid Bonds and Performance and Payment Bonds must be secured by a guaranty or a surety company listed in the latest issue of U.S. Treasury Circular 570 and shall be within the maximum amount specified for such company in said Circular 570. The "Bid Bond" and the "Performance and Payment Bond" must be issued by a surety company authorized to do business in the state where the project is located, and must be listed in U.S. Treasury Circular No. 570. The right is reserved to reject any or all bids or to waive any informalities in the bidding. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Prime bidders tendering a bonafide bid,except the successful Contractor, will be refunded their full deposit upon return of the bidding documents in good condition within 14 days after bid opening.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.