Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 18, 2023

September 18, 2023

No Information to Display

To Be Determined

Remodeling, Renovation

No Information to Display

$250,000.00

Public - Federal

img_map_placeholder

To Be Determined, Cape Canaveral, FL

Subscribe to View Full Documents

Provide all labor, equipment, materials, and transport needed in performing all work required to install Deluge Bypass Loop at Pump Station #7, Cape Canaveral Space Force Station (CCSFS) FL. Contractor shall use included scope of work to install a water flow loop for testing the six (6) deluge pumps and the two (2) fire pumps installed at Pump Station #7 which feeds deluge water to Space Launch Complex 40 (SLC-40) and SLC41. The flow loop will draw water from the existing pump suction and return it to the existing tank. Contract range is $100K to $250K. Proposals good until October 1, 2023. Period of Performance is 60 calendar days. Wage Scale is WD FL20230001 January 2023.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects