Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

September 22, 2023

November 22, 2024

To Be Determined

Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Marine Corps Base Hawaii, HI

Subscribe to View Full Documents

The project consists of demolition of an existing training gas chamber and construction of a new facility. The area is referred to as the Boondocker Training Area. In addition, an existing 2" waterline would be capped and partially removed. Two new fire hydrants and water lateral would be installed to supply an eyewash and shower station at the new gas chamber. The existing Gas Chamber to be demoed was was constructed in 1991 out of reinforced concrete walls and roof with a concrete mat foundation. Exterior materials and finishes consist of low slope membrane roofing, painted walls / painted hollow metal doors and prefinished ventilation louvers. A main gas chamber is flanked by entry and exit vestibules. Electrical and mechanical rooms complete the facility. The new Gas Chamber will be similar in size and layout to the existing and classified as a business occupancy. Construction will be noncombustible, and the construction type will be a minimum IBC Type II-B or Type II (000) as defined in NFPA 220. The structural framing system will consist of a reinforced concrete beams/slab roof supported by concrete bearings walls. The foundation will be comprised of a mat foundation. Subgrade foundation treatment including subsurface cavity probing, proof rolling, and overexcavation and backfill will be required. The primary lateral force resisting system will consist of the concrete floor/roof slab diaphragm and concrete shear walls. Hose bibs and eye wash stations will be provided at the Gas Chamber. The gas chamber will be provided with a complete wet pipe fire sprinkler system in accordance with NFPA 13. The sprinkler system will aid in the cooling of any heated tear gas and prevent the compromise of the mechanical gas filtration system in the event of a fire. The Gas Chamber Building will be provided with mechanical ventilation equipment that will evacuate the gas inside the facility, filter it, and discharge the air through a louvered penthouse on the roof. The CS gas will be filtered through a 65% efficient roughing filter, 95% pre-filter, HEPA filter (99.99%), and a carbon adsorption filter before being exhausted to the atmosphere. The exhaust fan will be a centrifugal type exhaust fan with a high efficiency motor. Low leakage outside air dampers interlocked with the exhaust fan will be provided. The design will include vestibules (airlocks) at entry and exit points, separate from the main chamber to purge the space of gas upon entering and exiting the building. The filtration system design will meet OSHA, federal, and state requirements. The project duration is 427 days. This project is Prevailing Wage. Trades Required: Construction Office Trailer, Portable Restrooms, Temporary Fencing, Material Testing, Construction Staking, Utility Locating, Final Cleaning, Demolition, Concrete, CMU Masonry, Rough Carpentry, Membrane Roofing (TPO), Copper Sheet Metal Flashing, Joint Sealants, Doors/Frames (FRP) & Hardware, Aluminum Windows, Skylights, Glazing, Metal Wall Louvers, Drywall & Framing, Painting, Signage, Fire Extinguishers & Cabinets, Fire Sprinkler, Plumbing, HVAC, Tetsing/Adjusting & Balancing, Electrical, Electrical Testing, Earthwork, Landscaping, Dry (Electrical) Utilities. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects