Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

August 28, 2023

January 22, 2024

Multiple Locations

Demolition, New Construction, Paving, Renovation, Site Work

No Information to Display

$4,789,834.00

Public - City

img_map_placeholder

Multiple Locations, Marion, MI

Subscribe to View Full Documents

**As of August 22, 2023, this project has been awarded. Awarded contractors are Salisbury Excavating (Contract 1), RCL Construction (Contract 2), and Maguire Iron (Contract 3) .** Contract No. 1 - Water Distribution: Items of work include approximately 2,500 feet of watermain installation through direct bury on Blevins Street, Pine Street, Main Street, Clark Street, River Alley, and Third Street. The work also includes abandoning existing watermains, connecting to existing watermains, new water services, valves, and new fire hydrants at various locations. Restoration work includes asphalt paving, concrete paving, concrete sidewalk and ramps, gravel driveways, curb and gutter replacement, topsoil and seeding and all related work. This contract also includes replacing the Villages water meters and implementation of a new radio-read reading system. Contract No. 2 - Water Supply: The project includes drilling one new Type 1 well, installation of a pump for the new well, construction of one new well house, new chemical feed system at the well house, the addition of one standby generator at the new one, and one at an existing well house, electrical work at two existing well houses, and all related work. Contract No. 3 - Water Storage: This project includes the construction of one new 150,000 elevated water storage tank, including but not limited to: tree removal, gravel driveway construction, concrete, watermain connections to the existing distribution system, utility coordination, site grading and drainage ditch establishment, surface restoration, and all related work. Demolition of the existing water storage standpipe, which includes all grouting, capping, etc. required for abandonment of all distribution piping from the existing storage tank, relocation of water meter communication equipment to the new tank, and all related work. Existing storage abandonment shall not be completed until the new storage tower is in service. The Village of Marion reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest of the Village of Marion. Bid Result Contract 1 Apex Excavating-$1,584,750 Contract 2 Cole Inc-$934,792 Contract 3 Maguire Iron Inc-$1,688,400

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.