Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

March 2, 2025

581 Harry S Truman Dr

Renovation, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

581 Harry S Truman Dr, Upper Marlboro, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work includes the removal of the existing bridge structure and construction of a new bridge. Replacement of the existing bridge will include a Prestressed Next Beam Bridge. The bridge work also consists of the driving of HP pile, construction of approach concrete slabs, deck overlay, concrete abutments and wing walls. Removal of the existing superstructure and pre-streesed concrete beams, Installation of abutment piles, concrete abutment, removal and reconstruction of the pier cap, installation of new Prestressed Concrete Beams, Concrete Deck, Concrete approach slab, Concrete parapet, reconstruction of approach roadway, Chanel dredging to remove heavy siltation to restore bridge opening, maintenance of traffic , pavement marking and signing and landscaping. Subsurface or latent physical conditions at the site differing materially from those indicated in this Contract. The work includes the removal of the existing bridge structure and construction of a new bridge. Replacement of the existing bridge will include a Prestressed Next Beam Bridge. The bridge work also consists of the driving of HP pile, construction of approach concrete slabs, deck overlay, concrete abutments and wing walls. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. E ($2,500,001 to $5,000,000)

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects