Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 19, 2023

August 18, 2023

September 30, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Schertz, TX

Subscribe to View Full Documents

As of August 4, 2023 , this project has not yet been awarded. A timeline for award has not yet been established. The City of Schertz is accepting Request for Bids for construction services of the 2023 SPAM RESURFACING PROJECT. Questions are due in writing no later than Wednesday, July 12, 2023 at 5:00 P.M (CST). All questions in reference to this procurement must be directed to the Purchasing Department in writing at purchasing@schertz.com. The City of Schertz reserves the right to refuse and reject any or all responses, waive any or all formalities or technicalities, accept the response or portions of the response determined to be the best and most advantageous to the City, and hold the responses for a period of 90 days without taking action. The City of Schertz reserves the right to accept responses from more than one firm determined to be the best option for the City. Respondents are required to hold their responses firm for the same period of time. WORK SEQUENCE: A. Construct work in stages to provide proper coordination with work by others. Coordinate the construction schedule and operations with the OWNER's representative. Reference to General Conditions Item 5.15, Sequence of Work and Section 01110, 1.03. o Notify residents of planned work o Set up traffic control measures. Maintain private and business access at all times o Remove existing pavement markings and raised pavement markers. o Confirm street surface suitable for slurry seal application, prepare as per specifications. o Complete slurry seal application. o Clean up.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.