Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

December 31, 2024

110 1st St

Addition, Demolition, Renovation, Site Work

No Information to Display

$5,240,027.00

Public - County

img_map_placeholder

110 1st St, Eufaula, OK

Subscribe to View Full Documents

This project includes the full renovation and additions for the three story McIntosh County courthouse located in Eufaula, OK. The additions consist of structural steel framing with full masonry veneer to match existing. There is a three story addition on the West and and single story vestibule entry on the East. The ground floor of the West addition is a CMU saferoom. The exterior of the existing building will be repaired and restored, replacing all windows and entries. The project will be completed in phases, starting with the new additions, then completing one level at a time on the interior renovations of the existing courthouse. As of August 3, 2023, Addenda #4 has been issued. Please be advised: Bid Package #6 Millwork – this scope of work has been removed and will bid at a later date once design documents and elements are completed. The bid date remains Thursday, August 10, 2023 at 2:00 PM. Construction is expected to begin September 2023. Completion is expected by the end of 2024. Bid Results : Site Demolition and Earthwork : Serratt Construction - $ 99,000.00 Select Demolition : Ark Wrecking - $ 147,600.00 Concrete Turnkey : Livingston Concrete - $ 205,754.00 Masonry and Masonry Restoration : C&N Masonry - $ 565,000.00 Misc. and Structural Steel - Fab & Erect : Advantage Terrafab - $ 442,000.00 Rough Carpentry : Williams Contracting - $ 67,700.00 Joint Sealants, Waterproofing, & Fluid Applied Weather Barrier : Midwest Waterproofing - $ 42,043.00 TPO Roofing and Sheet Metal : Allwine Roofing - $ 294,605.00 Finish Hardware, HM Frames, & Doors : Felix Thomson - $ 208,759.00 Flush Wood Doors : ABS Wood Specialties - $ 58,614.00 Div 8 & 10 Install : KM Davis Installations - $ 36,000.00 Drywall Assemblies and Ceilings, and Insulation : RLS Construction - $ 665,000.00 Flooring : T&S Taylor - $ 260,378.00 Painting : Skyco Painting - $ 143,290.00 Specialties : Werco Specialties - $ 22,110.00 Interior and Exterior Signage : Omega Design - $ 9,953.00 Fire Suppression : All American - $ 215,200.00 Plumbing and Utilities : JR Richmond Plumbing - $ 324,429.14 HVAC : Hollifield Service Co. - $ 796,292.00 Electrical : White Electric - $ 607,000.00 Fire Alarm and Low Voltage : JE Systems - $ 29,300.00

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects