Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 1, 2023
September 1, 2023
September 1, 2025
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - State/Provincial
Multiple Locations, Baker City, OR
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Oregon Trail Electric Cooperative (OTEC) is seeking proposals for security fence installation, maintenance and repair services, on a non-exclusive basis, as set forth in this Request for Proposals (RFP). Qualified Contractors ("Contractor" or "Contractors") known to be experienced in the installation, maintenance and repair of commercial and industrial security and other fences are encouraged to respond. Satisfactory evidence that the Contractor has the necessary capital, equipment, experience, and personnel to complete the work in in accordance with all application federal, state, and local regulations is required. Nothing in this Request for Proposals shall be construed to create any legal obligation on the part of Oregon Trail Electric Cooperative or any respondents. Oregon Trail Electric Cooperative reserves the right, in its sole discretion, to amend, suspend, terminate, or reissue this Request for Proposals in whole or in part, at any stage. In no event shall Oregon Trail Electric Cooperative be liable to respondents for any cost or damages incurred in connection with the Request for Proposals process, including but not limited to, any and all costs of preparing a response to this Request for Proposals or any other costs incurred in reliance on this Request for Proposals. All supporting documentation submitted in response to this Request for Proposals will become the property of Oregon Trail Electric Cooperative. Respondents may also withdraw their interest in the Request for Proposals, in writing, at any point in time as more information becomes known. The contractor will provide all labor, tools, equipment, and materials to perform installation, maintenance and repairs of new and existing chain link, wrought iron, split rail, wire rope, picket, and other fencing and gates, as assigned. Upon award of contract, Contractor will be expected to perform an initial inspection of all existing fences and make repair recommendations to Oregon Trail Electric Cooperative. Repairs shall be made in compliance with specifications provided by Oregon Trail Electric Cooperative. Contractor will also schedule and perform an annual condition inspection and provide reports to Oregon Trail Electric Cooperative detailing the results. Work Orders: Individual jobs or projects usually will be initiated by Oregon Trail Electric Cooperative as a Work Order. The contractor shall provide an estimate of time and materials as well as an estimated schedule for completion upon evaluation and discussion with Oregon Trail Electric Cooperative. The contractor shall only repair, replace, upgrade or install work that is directed by Oregon Trail Electric Cooperative and identified in the Work Order. If there are any questions regarding the work to be performed, the contractor is responsible for contacting the designated Oregon Trail Electric Cooperative representative and requesting clarification before proceeding. Contractor, contractors employees and others employed by contractor to perform work in substations will be required to undergo Oregon Trail Electric Cooperative provided training on substation safety and entry procedures. Background checks may be required for personnel entering substations. No Minimum Service Requirements: Services shall be provided by the contractor on an as-needed, nonexclusive basis. Oregon Trail Electric Cooperative does not represent that it will utilize any contractor's services in any guaranteed amount. No minimum dollar amount or number of Work Orders are guaranteed by Oregon Trail Electric Cooperative. An exhibit describing Oregon Trail Electric Cooperative owned facilities and locations to be included is provided in Appendix A. General specifications are provided in Appendix B. Oregon Trail Electric Cooperative reserves the right to negotiate with the Selected Contractor for a change in terms of the contract during the term of the contract and to make adjustments as necessary. If Oregon Trail Electric Cooperative and the Selected Contractor are unable to agree on a revised contract, Oregon Trail Electric Cooperative may seek new proposals and, upon a minimum of ten (10) calendar days written notice from Oregon Trail Electric Cooperative, may terminate the unexpired portion of the contract. Oregon Trail Electric Cooperative shall not be liable for any cost under this section beyond the contract price for the period where service is actually provided. Oregon Trail Electric Cooperative reserves the right to reject any or all proposals, in part or in their entirety, or to waive any informality or defect in any bid, or to accept any proposal which, in its opinion is deemed most advantageous to Oregon Trail Electric Cooperative. The anticipated start date is September 1st, 2023. The selected contractor will be expected to enter into a master services agreement with Oregon Trail Electric Cooperative for a contract period up to 24 months with the possibility of an extension.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Baker City, OR
Bid Date: Aug 21 2023
Baker City, OR
Bid Date: Oct 03 2023
Baker City, OR
Bid Date: Oct 24 2023
Baker City, OR
Bid Date: Aug 02 2023
Baker City, OR
Bid Date: Aug 07 2023
Hermiston, OR
Bid Date: Aug 22 2023
Umatilla, OR
Bid Date: Aug 28 2023
Cottage Grove, OR
Bid Date: Aug 15 2023
Portland, OR
Bid Date: Aug 07 2023
Chiloquin, OR
Bid Date: Aug 15 2023
Bend, OR
Bid Date: Jun 01 2023
Hermiston, OR
Bid Date: Aug 15 2023
Medford, OR
Bid Date: Jun 27 2023
Central Point, OR
--
Portland, OR
Bid Date: Aug 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
