Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

June 28, 2024

2717 S Morgantown Rd

Renovation, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

2717 S Morgantown Rd, Greenwood, IN

Subscribe to View Full Documents

The approximately 20,000 square-foot facility will include an instructional hitting space, hitting cages for softball, hitting bays for golf, and a practice space for cheerleading. Pre-Bid Questions Pre-bid requests for interpretation for this Project shall be directed to the Construction Manager (CM). All requests must be written and electronically transmitted. 1. CM: Juan Castillo E-mail: juan.castillo@aecom.com 2. CM: Chad Peters E-mail: chad.peters@aecom.com 3. CM: Jeff Garcia E-mail: jeff.garcia@aecom.com Separate prime contract bids, they are as follows: 1. General Trades & Sitework (BP#01) *Previously Bid* 2. Mechanical, Plumbing & Fire Protection (BP#02) - VOID 3. Electrical, Technology & Lighting (BP#03) *Previously Bid* 4. Access Control & Security (BP#04) *Previously Bid* 5. Plumbing (BP#05) 6. Mechanical (BP#06) 7. Ductwork (BP#07) 8. Fire Protection (BP#08) A bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction," or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 5 percent of the total bid. Bid security shall be forfeited if bid is withdrawn after closing time on date for receiving bids. Successful bidders are required to furnish separate satisfactory Performance Bond A312 and Payment Bond A312 from an acceptable surety in an amount equal to 100 percent of the full contract sum. Bidders shall state completion time along with their bid. Commence Work within 48 hours after signing contract or receiving a notice to proceed, and complete Work ready for completion as follows: Substantial Completion: March 29, 2024 Final Completion: June 28, 2024 The Owner reserves the right to reject each and every bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. No bidder may withdraw their bid within 60 days after the actual date of the bid opening thereof. Question Deadline 08/11/2023

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.