Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 28, 2023

August 28, 2023

February 12, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Monrovia, CA

Subscribe to View Full Documents

**As of July 12, 2023 , this project has not yet been awarded. The project is expected to be awarded on August, 2023.**  SCOPE OF WORK - The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. The Project Includes: Demolition of saw-cut and remove existing concrete sidewalk, curb and gutter, drive approaches, spandrel, saw-cut and remove AC pavement, remove trees, and tree stomps, cold mill AC pavement, excavation, and grading for all structures in the project. Remove wheel stops, trash enclosure, AC pavement, curbs, curb, and gutters, remove and salvage parking lot signs. Construction of: AC pavement rubberized w/fibers, slurry seal, concrete curb, curb and gutter, concrete pavement, drive approaches, sidewalk, spandrel, concrete pavement, loop detectors, alley approach, 8" and 14" ductile iron pipe, pipe fittings, pipe elbows and bends, gate valves, fire hydrant assemblies, water service assemblies, water services, trenching for pipe, AC patch adjust man holes, abandon pipe and fire hydrant, pot hole for utilities, ductile iron manifolds, water main blow offs, air vacs, pressure testing and disinfectant, waste water repairs, pre-clean and post clean waste water pipes, CCTV of waste water pipes, cut and grind intrusions, IT Pipes software, repair man holes bases, cut protruding laterals, CIPP liners, sewer bypass and dewatering, parking lot rehabilitation, remove salvage signs, wheel stops, variable curb heights, sand blast and paint electrical conduit and services, ADA striping and signage, landscaping and irrigation, trash enclosure, AC pavement, import soil, SWPPP and erosion control implementation, construction staging and traffic control, EV charging stations underground conduit and pull boxes, public notification, pedestrian and vehicular access, protect in place existing structures, mobilization, demobilization, bond, and insurance. The Engineer's Estimate for this project is $ 5,661,953.00

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.