Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

November 20, 2023

April 4, 2024

To Be Determined

Outdoor Lighting, Paving, Site Work

No Information to Display

$8,646,293.00

Public - City

img_map_placeholder

To Be Determined, Fresno, CA

Subscribe to View Full Documents

**As of October 16, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Bid Valid: 64 days from Bid Opening Liquidated Damages: $2,000 per calendar day The Construction Allocation for this project is $ 12,700,000 The scope of work includes but is not limited to; the construction and development of a ten-acre park and a public street. The new ten-acre park will be located in the center of a planned mixed-use development adjacent to the new West Fresno Satellite Campus (CCI Project #18), on the west side of MLK Jr. Boulevard Between Church and Jensen Avenues. The park design consists of the installation of drought tolerant planting, perimeter bioswales, 100 trees, walking paths, reclaimed water irrigation, a modular restroom, a themed playground, utilities, infrastructure, site furnishing, and LED park lighting. The public street includes but is not limited to the construction of a perimeter loop road (West Creek Village Way), which extends off of Church Avenue. The roadway construction consists of site utilities, drainage, sidewalks, street lighting, curb and gutter. No bid will be considered for award unless the Bidder at the time of bid opening is licensed with a valid Class "A" or "B" Contractor's License issued by the State of California. The Contractor shall diligently prosecute the work to completion for all bid items before the expiration of ONE HUNDRED FOURTY (140) working days from the date of the Notice to Proceed The City reserves the right to reject any and all bids.

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.