Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 17, 2024

December 31, 2026

8440 112 St NW

Renovation

No Information to Display

$8,350,000.00

Public - State/Provincial

img_map_placeholder

8440 112 St NW, Edmonton, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project ID/WBS No. : P-005499. Project involves a series of inter-related construction projects within the University of Alberta Mazankowski Heart Institute and University of Alberta Walter C. Makenzie hospital , along with the fit out of shelled space within MAHI to provide an additional 12 new ICU beds. New ICU Beds: Using existing shelled space (5A7.040) to create 2 new inpatient beds. Demolish the existing 5A8 space and construct a new purpose built ICU of 7 beds. Reassign rooms 5A7.064 and .068 to the former shelled space will allow the existing unit to maintain its 16 beds and the new unit to use 9 beds. Special Isolation Unit (SIU) Rooms: Renovation with the existing Special Isolation Unit and Burn Ward to improve the condition of the SIU rooms, particularly in regards to HVAC and isolation capabilities. Once completed, these rooms would also be useable as ICU beds (3 total) interchangeably with special isolation as needed. TIMELINE: Request for Proposals from Prime Consultant Services has been awarded. Preliminary planning and design to commence shortly. Complete scope of work and schedules for tender and construction may be confirmed late 2023/early 2024. *Construction budget is $8,350,000 *Method of delivery will be construction management.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.