Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

November 13, 2023

June 10, 2024

4477 Progress Dr

Site Work

No Information to Display

$5,000,000.00

Public - County

img_map_placeholder

4477 Progress Dr, South Bend, IN

Subscribe to View Full Documents

Gate 4 at South Bend International Airport currently is unused. This project includes construction of a new enclosed ADA compliant passenger access ramp at Gate 4 which will replace a previously removed individual use elevator and existing stairs. A new Service Animal Relief Area will be constructed outside of the original Gate 1 door, and a new business center will be constructed within the concourse. Gate 4 will be constructed as a common use gate to match the existing other gates in the facility. This project also relocates the existing passenger boarding bridge at Gate 8 to Gate 4 and provides a refurbished passenger boarding bridge installed at Gate 8.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.