Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 6, 2023
September 4, 2023
No Information to Display
599 Thomas E. Burgin Pkwy
New Construction, Paving, Site Work
No Information to Display
$77,653.00
Public - State/Provincial
599 Thomas E. Burgin Pkwy, Quincy, MA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
MBTA Quincy Bus Maintenance Facility, Quincy, MA (QBMF). QBMF includes but is not limited to the construction of a new, 300,000 square foot, 2-story, LEED Certified bus facility with BEB charging equipment (including but not limited to pantographs, chargers, and plug-in dispensers), charge management software (CMS), approximately 240 parking spaces, a new sidewalk along Burgin Parkway, an extension of Columbia Street to Burgin Parkway, a new signalized intersection, utility connection across Burgin Parkway to MBTA Quincy Adams Station communication room, a proposed electrical switching station, and two substations. The RFQ for Trade Contractors will be available online on starting June 9, 2023 at 9:00 AM EDT at www.Projectdog.com. Enter the Project Code 856349 in the project locator box and select Acquire Documents to download documents. Respondents must have an active online account on www.Projectdog.com to acquire documents, receive project notifications, and to submit SOQs electronically. All Trade Contractors interested in responding to this RFQ must complete the RFQ Interest Survey online at www.Projectdog.com prior to the submission deadline. Trade Contractor Statement of Qualifications Forms from interested trade subcontractors are sought for the following categories of work. Masonry Work: $6,915,108 Miscellaneous and Ornamental Iron: $2,457,043 Waterproofing, Damp-proofing and Caulking: $911,894 Roofing and Flashing: $8,866,151 Glass and Glazing: $116,017 Tile: $369,440 Acoustical Tile: $218,573 Resilient Floors: $254,326 Painting: $2,164,276 Elevators: $3,255,000 Fire Protection Sprinkler System: $4,957,852 Heating, Ventilating & Air-Conditioning (HVAC): $20,602,556 Plumbing: $8,424,354 Electrical Work: $89,596,331 Anticipated substantial completion is fall 2026.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Quincy, MA
Bid Date: May 18 2023
Quincy, MA
Bid Date: Sep 14 2023
Quincy, MA
Bid Date: Sep 14 2023
Quincy, MA
Bid Date: May 12 2022
Quincy, MA
--
Quincy, MA
--
Quincy, MA
Bid Date: Jun 20 2023
Quincy, MA
Bid Date: Apr 28 2023
Quincy, MA
--
Quincy, MA
Bid Date: Aug 15 2023
Quincy, MA
Bid Date: Oct 18 2023
Quincy, MA
Bid Date: Aug 03 2023
North Adams, MA
Bid Date: Sep 06 2023
Fitchburg, MA
Bid Date: Sep 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
