Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

February 1, 2024

March 26, 2024

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Walnut, CA

Subscribe to View Full Documents

Replace six existing AC units in Building 23. Existing AC units were installed in 1999, 24 years old now, already beyond their service life. New AC units shall be heat pump (no gas) units and shall match the capacities of the existing. Existing supply and return ducts shall remain Question Deadline 07/07/2023 at 2:00 PM PT Recommendation for Award Date: September 13, 2023 Construction Cost Estimate: $250,000 and Allowance: $50,000 Project Name & Summary a. Building 23 AC Units Replacement b. Replace six existing AC units in Building 23. Existing AC units were installed in 1999, 24 years old now, already beyond their service life. New AC units shall be heat pump (no gas) units and shall match the capacities of the existing. Existing supply and return ducts shall remain. o Remove and dispose of six existing AC (gas/electric) units. o Provide new heat pump package AC units with economizer. o Provide base rail for the new AC units. o Rework and modify sections of existing supply and return ducts, and bypass ducts, as required to accommodate installation of new AC units. o Remove and cap off sections of existing gas piping. o Rework and modify existing power wiring from existing disconnect switches to new AC unit power terminals. o Route new condensate drain piping. o Modify existing ALC controllers to accommodate new heat pump AC units with economizer including new graphics and programming. o Perform air balancing to AC units only. o Remove and reinstall existing duct smoke detectors. o Provide temporary portable AC units and accessories.

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.