Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 7, 2023

September 6, 2023

March 22, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Bullhead City, AZ

Subscribe to View Full Documents

The City of Bullhead City, Arizona is extending an Invitation for Bid The Project involves installing two new production wells for the Bullhead City public water supply system. This work includes drilling, construction, development, testing and disinfection of the new wells. The intent of the project is to drill and construct the two new water supply wells The City of Bullhead City reserves the right to accept or reject any or all responses or parts thereto. Technical Questions regarding the substance of this IFB must be in writing or by email and received no later than July 11, 2023. Questions may then be responded to by written amendment to this document. Oral statements or instructions do not constitute an amendment to the IFB. The work involves installing two new production wells for the Bullhead City public water supply system. Well 24-2 will replace Well 24-1, and the boring S-1 location will provide a new well supply location. This work includes drilling, construction, development, testing and disinfection of the new wells The intent of the project is to drill and construct the two new water supply wells with a design capacity of 1,400 gpm each, or greater. B. Abandonment of existing Well 24-1 is to be bid as an Optional, Owner approved task. C. New Wells 24-2 and Well S-1 are to be constructed to the following design dimensions. The actual final depths shall be finalized by the Engineer from the pilot hole drilling results and provided to the Contractor within 5 days following pilot hole completion and receipt of the sieve analysis results.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.