Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 21, 2024

No Information to Display

To Be Determined

Renovation

No Information to Display

$1,210,565.00

Public - City

img_map_placeholder

To Be Determined, Kerrville, TX

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Kerrville Police Department Communications Center is the Public Safety Answering Point (PSAP) for all Kerr County; with EMS services being available county wide. Many operational challenges include: no ability to separate radio traffic during emergency events, special operations, or general daily operations, limited communications to the geographic capability of our single tower system, daily dropped or garbled transmissions, poor or no communication within large structures, dispatch operation and role assignments are limited and antiquated. These challenges all present serious public safety issues. This project will capture all expenditures related to implementing a new single site - 6 channel, 700 MHz trunked system to include: replacement of single-band radios (KPD and KFD): 86 in car radios, 150 portable radios, upgrade of all dispatch consoles to provide new features to improve response times, microwave link for increased resiliency, radios with newer technology and better audio quality. This project is included in the city's Fiscal Years 2023-2032 Capital Improvement Program. As of October 25, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.