Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 17, 2023

October 26, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Arroyo Grande, CA

Subscribe to View Full Documents

In general, the project consists of the removal of existing and installation of new paver bands in sidewalks, paver crosswalks, curb ramps, curb, gutter, and sidewalk, the installation of exposed aggregate concrete sidewalks, removal and replacement of lifted and/or broken sidewalks, and curb/gutter sections. The project estimated construction cost for the Base Bid is $375,000. Contract time is established as 50 working days. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond Contractor shall forthwith furnish in triplicate, a faithful performance bond in an amount equal to 100% of the contract price and a labor and materials bond in an amount equal to 100% made payable to the City of Arroyo Grande for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City Arroyo Grande if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of Arroyo Grande reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared on the basis of the Public Works Director's estimate of the quantities of work to be done, as shown on the Bid Item List The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance with the specified time limits. Anything submitted after the specified time limit will be rejected and not be considered. The Director of Public Works or Designee may request additional information to be submitted within three days of the request, unless otherwise specified, and will notify the protester of the ruling within ten days of the determination. Pursuant to the Public Records Act (Government Code, 6250, et seq.), the City will make public records available upon request.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.