Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 21, 2023

August 21, 2023

October 2, 2023

3851 London Groveport Rd

Site Work

No Information to Display

$1,724,328.00

Public - State/Provincial

img_map_placeholder

3851 London Groveport Rd, Grove City, OH

Subscribe to View Full Documents

A. The Work is located on the site of the Franklin County Sanitary Landfill at 3851 London-Groveport Road, Grove City, Ohio 43123. B. The Work to be performed under this Contract includes, but is not limited to, the construction of the Work as described below and all other appurtenances and related Work required. The Work shall be as follows: 1. Construction of 2023 Landfill Gas (LFG) System at an existing, operating, landfill, consisting of the following: a. Supply and Installation of LFG extraction wells. b. Supply and Installation of LFG horizontal collectors, header, air and forcemain piping. c. Abandonment of existing LFG extraction wells. 2. Miscellaneous Work a. Seeding and mulching of disturbed areas and stockpiles. b. Appurtenant work as required. C. Contracting Method: The Work will be constructed under one prime contract. i. The Construction of the 2023 Gas Collection and Control System at the Franklin County Sanitary Landfill, as described in the RFB, is for the duration of six (6) weeks for the base bid and two (2) weeks for the optional work. ii. The Project scope includes, but is not limited to, installation of new lateral lines, new vertical gas collection wells, new horizontal collectors, new de-watering sumps, abandonment of wells, other miscellaneous improvements, and site restoration. iii. The project includes base and optional work. SWACO will award all, some, or none of the optional work with the Notice to Proceed. iv. The Bidder is to include proposed construction start and completion dates as part of the bid package. These dates will become part of the contract. The duration of the base bed work cannot exceed six (6) weeks and the duration of the optional work cannot exceed two (2) weeks. Deadline for questions or clarification 4:00 p.m., July 14, 2023 Contact Mr. Fannin in writing only at danny.fannin@swaco.org for questions concerning this RFB. No phone calls please. SWACO reserves the right to reject any and all bids and/or to waive minor irregularities or informalities in the bidding process.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects