Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

November 7, 2023

May 6, 2027

To Be Determined

Site Work

No Information to Display

$38,234,400.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Cleveland, OH

Subscribe to View Full Documents

The Contract will be subject to the NEORSD policies and goals regarding the use of minority, women, and small business enterprises (MBE/WBE/SBE). This policy is contained in the Contract Specifications. The MBE/WBE/SBE goal for this Contract is 15% MBE/WBE and 3% SBE. The NEORSD reserves the right to reject any and all Bids, and to waive any informalities or irregularities in the Bids received. Bidders shall review the Instructions to Bidders and all other contract documents prior to submitting a bid for this project. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: o Replacement of flexible membrane aeration equipment o Cleaning, hauling and disposal of solids, sludge and other materials within channels, aeration tanks, conduits, and piping o Prestressed concrete cylinder piping, cleaning, CCTV inspection, and repair o Replacement of process air compressor, rehabilitation of existing process air compressors, new local control panels and starter modifications o Replacement of multistage centrifugal blowers and channel mixing systems o Sluice gate and knife gate valve rehabilitation, new slide gates, new rectangular butterfly valves, new butterfly valves, new motor actuators o Replacement of dewatering pumps, valves and piping modifications o New area programmable logic controller This meeting has been set in order to provide all potential Bidders an opportunity to discuss with the Owner all aspects of the Contract Documents for the Southerly Wastewater Treatment Center Second Stage Aeration Improvements. A o Concrete structural repairs, building cladding, window and door replacement, and painting o Ventilation systems and temperature controls, sump pump modifications o Electrical and instrumentation including new area programmable logic controller. o Refer to the Contract Documents and the Summary of Work Specification Section 01 11 00. All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Mr. Harry Shaposka at (216) 881-6600 or e-mail ShaposkaH@neorsd.org. The Engineer's Estimate for Southerly Wastewater Treatment Center Second Stage Aeration Improvements is $41,000,000.00. The Contract will be subject to the NEORSD policies and goals regarding the use of minority, women, and small business enterprises (MBE/WBE/SBE). This policy is contained in the Contract Specifications. The MBE/WBE/SBE goal for this Contract is 15% MBE/WBE and 3% SBE. All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Mr. Harry Shaposka at (216) 881-6600 or e-mail ShaposkaH@neorsd.org.

74 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.