Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

September 4, 2023

May 1, 2024

E Till Rd

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

E Till Rd, Fort Wayne, IN

Subscribe to View Full Documents

The funding source for this project is Septic Elimination Relief Fund. The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Till Road Septic Elimination Project as follows: Install approximately 2,663 LF of 3" HDPE force main, 3064 LF of 1.5" HDPE force main, and 15 grinder pump stations east of Dawson's Creek and west of Coldwater Rd. all in accordance with the Bidding Documents as prepared by the City Utilities Engineering Department, City of Fort Wayne, Indiana. No Bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City of Fort Wayne, Indiana, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City, or is engaged in litigation with the City. No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Design Manager in writing. Interpretations or clarifications considered necessary by Design Manager in response to such questions will be issued by the issuing office (herein QuestCDN) to all parties recorded as having received the Bidding Documents.Question Deadline 06/26/2023

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects