Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

October 2, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Crawfordville, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Phase 3 Upgrade project includes sitework improvements (i.e. grading, stormwater pond, gravel driveway, etc.) and the construction of an administration and maintenance building. The project also includes the following: a 2mm mechanical bar screen system, a grit removal system, a 0.6 million gallon (MG) influent equalization basin (IEQ), a 0.6 MGD biological nutrient removal (BNR) train, modifications to the existing BNR trains, an additional belt press system, a septage receiving pump station, on-site sanitary sewer and plant service water modifications, new vertical turbine pumps, modify the existing reject storage pond, line the existing reject and wet weather storage pond, and the installation of all piping, valves, and appurtenances to make the plant a complete and operational system. The purpose of this program is to provide wastewater and stormwater infrastructure improvements to reduce discharges of pollutants to the springshed of Wakulla Springs - and to the surface waters of the Wakulla River, St. Marks River, and Apalachee Bay - from existing septic systems and sewer overflows. The objectives of the program are to: (1) reduce nutrient and bacteria loads to the groundwater from septic tanks; and, (2) reduce nutrient, bacteria, and sediments load to surface waters from sanitary sewer overflows and untreated stormwater runoff. The funding available for this project is $19,839,565.00. Question Deadline 06/22/2023 at 5:00 PM ET All inquiries and questions concerning this ITB, must be in writing (e-mail is acceptable), and must be directed to: Patty Taylor, ptaylor@mywakulla.com or mailed to 3093 Crawfordville Highway, Crawfordville, FL 32327.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects