Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

August 9, 2023

August 16, 2023

201 Presidents' Cir

Demolition, Renovation, Site Work

No Information to Display

$2,700,000.00

Public - State/Provincial

img_map_placeholder

201 Presidents' Cir, Salt Lake City, UT

Subscribe to View Full Documents

**As of August 22, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Scope of Work : This project is primarily concerned with demolishing and replacing the existing expansion tanks in the East HTW Plant at the University of Utah. In order to bring the new tanks into position, the roof will need to be partially removed and replaced. During construction the roof will need to be adequately covered to prevent damage to the building and equipment. There will also being piping will be replaced during the process of replacing the tanks. Persons or companies bidding on this project shall hold a current Utah Contractor's License covering the type of work to be done and shall be bondable to the amount of the Contract. The Bid Bond in the amount not less than five percent (5%) of the above bid sum, shall become the property of the University of Utah as liquidated damages for delay and additional expense caused thereby in the event that the contract is not executed and/or acceptable 100% Performance and Payment Bonds are not delivered within the time set forth. Upon issuance of the Notice of Intent to the selected bidder (a letter to the Contractor issued by U Facilities) and the official Contract (Contractor's Agreement), the undersigned agrees to return the original signed Contract, and deliver acceptable Performance and Payment Bonds in the prescribed form in the amount of 100% of the Contract Sum for faithful performance of the Contract, and deliver an acceptable Certificate of Insurance, all within ten (10) calendar days of the date on the Notice of Intent, unless a shorter time is specified in the Contract Documents. Construction Budget : $1,920,959.00 ALL QUESTIONS MUST BE POSTED THROUGH ELECTRONICALLY. Question Deadline 06/26/2023 at 6:00 PM MT The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects