Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

July 31, 2023

August 14, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$167,120.00

Public - City

img_map_placeholder

Multiple Locations, Grover Beach, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Grover Beach is requesting quotes from qualified Contractors to perform pavement repairs on major City roadways The City of Grover Beach is looking to contract major roadway repairs along West Grand Avenue, South Oak Park Boulevard, and The Pike. Additional as-needed work is also included for El Camino Real. The work will require traffic control at all times for all roadways. Traffic striping shall be restored for all areas in which it is disturbed/removed. It is estimated that 10 traffic loops will be impacted by the pavement repair work and will require restoration. No roadway closures are permitted at any time. Please see Exhibit A for the approximate locations of the pavement repairs. The exhibit was prepared after a site walk by City staff but the limits of work shown are approximate. The work shall be completed within TEN (10) working days Work shall generally be performed between the hours of 8 a.m. and 5 p.m. on weekdays, excluding City observed Holidays The City reserves the right to delete any portion of the work described prior to the beginning of the work and the Contractor shall not be compensated for that work. There will be no pre-bid site walk for this project. The work shall be completed within TEN (10) working days

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects