Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 11, 2023

July 13, 2023

September 5, 2023

680 Rue Sherbrooke O

Renovation

No Information to Display

$259,500.00

Public - State/Provincial

img_map_placeholder

680 Rue Sherbrooke O, Montreal, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

*Award subject to final approval Reference number : 1735414 Deadline for receipt of complaints: 2023-06-26 Built in 1976, 25 storeys, indoor area: 34,534 m2 Provide a 600amp 600volt V7H3606JP+VB6-150 siemens drawer in the main 600volt 3phase siemens panel on the 21st floor (shut down Sunday night). Provide suspension at approximately 25 to 30 feet high on "cantrust" and include seismic bracing on the 21st floor all along the Teak cable passage. Supply and install 2 vertical type Teak cables 3#500mcm from the 21st to the 4th floor room 0403 of the building. A distance of about 350feet each # 3C 500KCMIL /37 B NS XLPE AIA PVC 1000V Mineshaft CSA TECK 90 Cable. Provide a Teak #4/0 cable of vertical type, single conductor from the main malt bar on the 21st floor, up to the 4th in room 0403, in addition install a pre-drilled and threaded malt bar, make the connections with Thomas and Betts compression seals, about 350feet 1C 4/0AWG /19B NS XLPE AIA PVC 1000V Mineshaft CSA TECK 90 Cable. Provide "sleeves" when passing walls and floors for cables and fire sealants type Hilti. Make "scans" of slab on each floor, do not drill through a reinforcing rod. On each floor, it is necessary to do a "racking to cantrust", slab to slab (seismic) in order to support the 3 vertical type cables, they will be supported with a basket every 15m, in addition, there will be a curve of 90 degrees every 15m. All cables will be identified every 30 feet and at each wall or slab outlet with Brady LC-178X15-B7644-0.05 labels, attached with self-locking fasteners and having a Ptouch identification (so 2 per floor in electric wardrobes). Remove the door from room 0403 and part of the wall to let the transformer in. Reinstall the door, patch and paint the wall, McGill will provide the colour code. Provide a cleanliness slab for the transformer, certified by seismic engineer. Provide Novibra supports of sufficient capacity for the transformer or higher. Provide a 600amp NEMA 3R fuse switch, provide a core transformer and box in 2 sets, dismantled in the factory by Delta, recertify everything at the site in order to have the label on the front 450kVA 600/347-600 CD6C0450VVA6XXBD. For the distance between the transformer and the panel, calculate 10 feet distance, the connections to the transformer coming from the switch and towards the panel will be in "sealtight" with adequate connector, provide sealing rings (O-ring) on the connectors, all connections will be made from below or sides of the switches and panels. Provide and install a new panel with 600V-600amp3P-4F-65kA Copper hand breaker, NEMA 2 with "gasket" and "door in door". Provide the following circuit breakers: 1x400amp, 2x 200amp, 2x100amp and 2x60amp. All circuit breakers must be 65kA, no serial protection will be accepted. All noisy work must be done outside normal working hours. The premises must be cleaned daily. Provide a seismic certificate at the end of the work, by an engineer. There is no freight elevator in the building, so protection must be provided in the elevator. On the 5th and 7th floors, move the transformer into the electric closet to carry out drilling and scanning work (provide shut Down). Please follow the included McGill Design Standards.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects