Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2023

October 2, 2023

April 17, 2025

To Be Determined

Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Clay, WV

Subscribe to View Full Documents

The Project includes the following Work: Contract No. 1: consists of modifications to the existing wastewater treatment facility including replacement of existing mechanical screen, screen channel, controls, conversion of existing concrete package plant basins to batch reactor treatment technology, aerobic digester modifications, new blowers, controls, new precast concrete chlorine contact basin, modifications to existing chlorine contact tank, new chlorination dechlorination equipment, new submersible effluent pump station, modifications to existing plant pump station, modifications to existing lab ffice building, new sludge dewatering system, electrical modifications, piping modifications, site work, demolition, new emergency generator, pumps, controls, flow meters, automatic samplers, telemetry, and all other appurtenances shown on the plans and r detailed in the specifications that are necessary for a complete and operable wastewater treatment system upgrade; modifications to Lift Station No. 1, Lift Station No. 2, Lift Station No. 3, Lift Station No. 4, and Lift Station No. 7, 1100 LF of 10" Restrained Joint PVC installed by pipe bursting (including all surface restoration & bypass pumping), Reconnection of 13 existing laterals to new 10" PVC gravity sewer, Replacement of 4 existing 4' Diameter Precast Manholes including Cast Iron Watertight rings and covers, purchase of a 1 1/2 Ton Four Wheel Drive Dump Truck, a Trailer mounted sewer jetter, a Trailer mounted sewer vacuum, Mobilization Demobilization, Preconstruction Video, 2 Field Offices, a Site Sign, and 50 Tons of Special Fill Material; Work shall also include erosion control, temporary pumping and controls to maintain the facilities in an uninterrupted serviceable condition and all other required appurtenances, materials and equipment required for a complete and operable wastewater collection and treatment system. Bids shall be accompanied by a certified check or bid bond payable to the Town of Clay in an amount equal to five percent (5%) of the base bid. The Town of Clay reserves the right to reject any and all bids. Question Deadline 07/19/2023 at 1:00 PM ET

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.