Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 12, 2024

No Information to Display

Raven Ave & Rosanna St

New Construction, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Raven Ave & Rosanna St, Enterprise, NV

Subscribe to View Full Documents

The Work consists of the construction of a 10,233 gross square foot, single story, 3-apparatus bay fire station including housing sleeping quarters and living spaces. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: New construction includes a new 10,233 gross sf, 3-apparatus bay Fire Station with 10' - 0" x 21'-4" trash enclosure and its associated site work and off-site work. The Project to be located on a 2.1-acre site on Raven Avenue and Rosanna Street. The offsite work includes removal and replacement of the pavement on the south side of Raven Ave. to match what was installed by adjacent home builder on the north side of Raven Avenue. This extends from Rossana to the east side of Rainbow Blvd. to account for utility connections and modifying center median in Rainbow Blvd. for emergency fire access. Utility improvements consist of sewer lateral, water main connection, emergency flashers and associated conduit for flasher and dry utilities. On site work includes Fire and public access and egress, parking with AC pavement and landscaping. on-site parking lot and driveways with AC pavement. Secure portion of the site is fully fenced with secure gates for both vehicular and pedestrian access; Desert adaptive landscape, consisting of trees, shrubs, boulders, mounding and decorative rock. The building structure includes steel column, metal framing, steel joist, metal canopy and metal deck. The Office / Dorm Rooms, Apparatus Bay Turn Out, Laundry, Clean Room, mechanical yard exterior walls are CMU bearing walls with interior metal stud bearing walls; Concrete slab-on-grade floor system with polished concrete flooring and other floor finishes such as ceramic tiles, epoxy flooring, rubber floor tiles, etc. as specified in Division 9. Exterior finishes consist of CMU walls with rigid insulation on the interior side, storefront and doors, single ply fully adhered roof system, standing seam metal roof and wall system, decorative masonry veneer and metal canopy with translucent panel at Entry, insulated translucent fiberglass sandwich panel assemblies, high speed motorized exterior swinging four-fold door systems, tubular daylight device, solar collector panels and exterior building signage. Interior finishes including ceramic wall tiles, painted gypsum board, acoustical ceiling tiles in “T-bar” grid, sound absorbing wall units, tackboards, plastic laminate clad casework, stainless steel countertop and solid surface countertops, painted hollow metal door frames and windows, interior signage and graphics, corner guard, wire mesh storage lockers, toilet accessories, roller window shades and fire extinguishers in cabinets. All exterior CMU walls, including monument signage CMU walls, trash enclosure CMU walls and masonry veneer finishes at Entry to be provided with anti-graffiti. The building includes mechanical, electrical, plumbing, and low voltage systems that include access controls, lighting and daylighting controls, intrusion controls and audio-visual system. The building is provided with automatic fire sprinkler systemin accordance with NFPA and Clark County Fire Code Amendments. The system water supply will be supported with an electric fire booster pump. The required fire department connection will be mounted within 100 feet of a public fire hydrant. The building also include a fire alarm system in accordance with NFPA 72 and Clark County Fire Code amendments. The building will require a diesel generator with full power back up to the building. Equipment includes, furniture, fixtures, and equipment, identified on Sheet A2.02A and Sheet A2.02B Furniture, Fixtures and Equipment Plan and as outlined in Division 10, Division 11, and Division 12. Question Cutoff Date: 7/24/2023 08:00 PM (ET)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.