Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

February 21, 2024

5 Barry Way

Paving, Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

5 Barry Way, Larkspur, CA

Subscribe to View Full Documents

Reference Number 0000317646 Question Deadline 10/17/2023 at 5:00 PM PT Question deadline date changed from 09/28/2023 As per Addendum 3 Questions are submitted online Yes Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; installation of new water utility lines and drainage system; grading; installation of new play structures, ornamental features, art sculptures, tables, benches, and drinking fountains; installation of new ADA surfacing for pathways (concrete, DG, etc) and the play areas (synthetic surf, sand, pebbles, wood fiber); installation of short retaining walls and perimeter fencing; installation of landscaping materials, plants, and irrigation systems. Standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. Removal of packing materials and general cleanup of the project area shall be included. Bid Intent Not Available Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; o installation of new water utility lines and drainage system; o grading; o installation of new play structures, ornamental features, art sculptures, tables, benches, drinking fountains, and other site furnishings; o installation of new surfacing for pathways and play areas; o installation of short retaining walls and perimeter fencing; o installation of landscaping materials, plants, and irrigation system; o standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. o cleanup of the project area during and after construction; o All playground furnishings and materials shall be installed in a manner in accordance with current ASTM and CPSC playground safety standards and guidelines; o Any and all other work required to complete project per plans. There will be no mandatory pre-bid conference, however, it is recommended that Contractor visit the site prior to submitting a bid. Questions are submitted online Yes General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Defective Materials/Workmanshi 10 % Engineer's Estimate is approx $600,000. The Project commencement date must be no later than November 27, 2023

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.