Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 11, 2023

November 10, 2023

To Be Determined

Renovation, Site Work

No Information to Display

$470,398.00

Public - City

img_map_placeholder

To Be Determined, Schuylkill Township, PA

Subscribe to View Full Documents

The project includes providing all labor, equipment and materials to complete the demolition and replacement of existing paved trail, prepare stone pad for placement of a prefabricated restroom building with water, electric and sewer service connections, and installation of underground electrical conduits. Work also includes furnishing and installing E-One DH151 Pump Station System and forcemain with connection to an existing sanitary sewer manhole. Work also includes water supply connection and storm sewer extension. Work also includes trench restoration and site stabilization activities, including temporary erosion and sedimentation controls. The work also includes furnishing, placement and compaction of fill material to bring the site to grade, furnishing and placement of topsoil, final grading and seeding and mulching all disturbed areas. The work includes removal and proper disposal of demolition debris and rubble. Each bid must be accompanied by a bid bond or a certified check in an amount not less than ten percent (10%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. No bid may be withdrawn for the period of days stated in the bid form from the date the bids are opened. The successful bidder will be required to furnish satisfactory Performance and Payment Bonds in the amount of 100% of the Contract amount and a Maintenance Bond in the amount equal to fifteen percent (15%) of the contract amount, thereafter required on the specified Bond Forms included in the Contract Documents and Waiver of Lien. The right is reserved to waive any informality in the Bid, to reject any or all Bids, and to accept any Bid which is deemed most favorable to the Owner, at the time and under the circumstances stipulated. A, questions during construction of the Work covered by this Contract should be directed to Curtis English, Project Manager, Gilmore & Associates, Inc., 184 W. Main Street, Suite 300, Trappe, PA 19426, Telephone: (610) 489-4949, Fax: (610) 489-8447. Email: cenglish@gilmore-assoc.com.

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects