Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

July 15, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$450,000.00

Public - City

img_map_placeholder

Multiple Locations, Santa Clara, CA

Subscribe to View Full Documents

DESCRIPTION OF WORK - The Work shall consist of the replacement of existing storm drain sluice gates, gate frames, gate lifts, and appurtenances at the Eastside Storm Drain Pump Station and the Rambo Storm Drain Pump Station. CONTRACT TIME. The Work shall reach Substantial Completion within two hundred eighty (280) Calendar Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within three hundred (300) Calendar Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. PREVAILING WAGE LAWS. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. BID PREPARATION COST. Bidders are solely responsible for the cost of preparing their Bids. RESERVATION OF RIGHTS. City specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. A California "A" or "B" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. The Bidder and subcontractor(s) must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. The Bidder or subcontractor(s) may not be awarded the Contract unless registered as noted above. City specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects