Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

September 15, 2023

March 31, 2024

200 Boulevard René-Lévesque O

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

200 Boulevard René-Lévesque O, Montreal, QC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000254465 Question Acceptance Deadline Aug 25, 2023 12:00 AM EDT Questions are submitted online Yes Term: Sep 15, 2023 12:00 AM EDT - Mar 31, 2024 12:00 AM EDT Option: 4 x 1 year BGIS wishes to retain the services of a specialized contractor for roof preventive maintenance services for a period of nine (9) months with four (4) one (1) year renewal options. The contractor must be able to perform all tasks related to the services identified below and not limited to: Membrane cleaning; Debris cleaning; Drain cleaning; Remove all redundant or obsolete boxes and repair the membrane according to the specified repair techniques. Modified bitumen membrane on upstands; Replacement of putty boxes; Replacement of deteriorated sealant; Repair of wrinkles, blisters and cracked membrane; Tin works: Replace all damaged pieces of metal flashing and counter flashing. When replacing metal flashings, reinforce all vertical joints of the membrane under the metal flashings. Apply a coat of anti-rust primer to all metal flashings showing rust then apply a coat of exterior paint. Correct the slope of horizontal flashings when they have a negative slope (towards the wall). Change the slope so that the flashings are a 2° outward slope. Plumbing Vent: Raise all plumbing vents to a minimum height of 12'' above the gravel surface of the roof. Seal them and insulate them with spray urethane. Caulking work: Apply new sealant to all joints between materials where sealant is missing where needed. Replace all sealant joints over 5 years old with new ones. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects