Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

September 11, 2023

September 10, 2024

Multiple Locations

Demolition, New Construction, Site Work

No Information to Display

$6,737,500.00

Public - City

img_map_placeholder

Multiple Locations, Blue Ridge, GA

Subscribe to View Full Documents

**As of August 16, 2023 this project has not yet been awarded. A timeline for award has not yet been established.** The project consist of, but is not limited to, the following major elements: Bidder agrees to furnish all materials and equipment and perform all labor necessary to construct the improvements to the water pollution control plant as shown on the Drawings and as specified. More specifically, the work shall include, but not be limited to, modifications to the headworks structure including demolition of the existing bar screen and installation of a new screen, replacement of five (5) actuated valves at the sequencing batch reactors, demolition of the existing sludge pump building that is attached to the digester, construction of a new sludge pump building, construction of a new sludge dewatering building, electrical work and new SCADA system. The work also includes demolition, clearing and grubbing, earthwork, site work, yard piping, erosion and sediment control measures, grassing construction staking, mobilization/demobilization, bonds, insurance, delivery of materials, take offs and all other appurtenances required for completion of the work as shown and as specified. Time allotted for completion of work is 365 calendar days from the date of a written ''Notice to Proceed'' from Owner. The Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Questions to Engineer may be submitted via Quest until Wednesday, July 5, 2023. Any other questions can be directed to the issuing office, Carter & Sloope, Inc., Canton, GA, 770-479-8782

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.