Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

October 13, 2023

October 14, 2025

Hammond Pond Pkwy

Site Work

No Information to Display

$11,390,785.00

Public - State/Provincial

img_map_placeholder

Hammond Pond Pkwy, Newton, MA

Subscribe to View Full Documents

Hammond Pond Parkway Improvements: installation of erosion and sediment control, reconstruction and mill/overlay of the parkway, installation of two traffic signal locations, new street lighting system, modifications to the existing drainage system, plantings, installation of guardrail and other incidental work necessary to complete the proposed project. The work is to be accomplished within 730 calendar days of a notice to proceed\ The contract also includes the participation of Veteran-Owned Business Enterprises ( VOBE ). The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. The contractor should consider these participation goals of 10.4% MBE/WBE and 3.0% VOBE as requirements under the contract. Compliance will be monitored by DCR throughout the duration of the work and will be included as part of periodic payments, contract close-out and contractor final evaluation. The project consists of, but is not limited to the following: installation of erosion and sediment control, establishment of temporary traffic controls, clearing and grubbing, excavation (including temporary earth support system, if selected by the Contractor), staged modifications to Bridge No. N-12-060, installation of the proposed shared use path (including amenities), full depth reconstruction and mill/overlay of the parkway, installation of two traffic signal locations, installation of a new street lighting system, modifications to the existing drainage system, new plantings, installation of guardrail and other incidental work necessary to complete the proposed project. Written Questions shall be submitted to: Attn: Dan Driscoll, Project Manager Department of Conservation and Recreation

59 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects