Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 17, 2023

February 13, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Newnan, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of August 4,2023 , this project has not yet been awarded. The project is expected to be Award of the contract will be before City Council August 8, 20233.** The City of Newnan will accept sealed bids from qualified Contractors for furnishing all labor, equipment, materials and other things necessary to complete the project, Asphaltic Concrete Pavement Preservation- 2023. This work includes the variable depth milling, deep patching, and overlay of approximately 2.799 centerline miles on 10 streets, and full depth reclamation and paving of approximately 72238 SY on 7 streets, and the application of thermoplastic traffic stripe and pavement markings. The Contractor shall furnish all materials, labor, tools, equipment and services required, including traffic control, to complete the project and fulfill the terms and conditions of this Invitation to Bid. The work shall begin after the issuance of a Notice to Proceed by the City of Newnan and shall be carried through to completion without unreasonable delay and without suspension of work unless authorized in writing by the City of Newnan. The number of calendar days allowed to complete the work is 180 days from date of Notice to Proceed. Questions of a technical nature should be submitted to Michael Klahr mklahr@newnanga.gov, Director of Engineering by email or phone, by Friday, July 7, 2023; responses to be issued by Wednesday, July 12, 2023 The City of Newnan desires to contract for mill, deep patch and overlay; full depth reclamation; and other maintenance work for various streets. Part of the work will be funded with assistance from the Local Maintenance & Improvement Grant (LMIG) program. See ExhibitA. Streets associated with LMIG are identified as such in Exhibit A. A listing of the street sections and limits for mill, deep patched and overlay is attached as Exhibit A. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.