Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

February 4, 2024

To Be Determined

Renovation

No Information to Display

$261,500.00

Public - City

img_map_placeholder

To Be Determined, Emmet, AR

Subscribe to View Full Documents

**As of August 21, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The scope of work consists of furnishing all materials, labor, and all activities required for the repainting of the existing 50,000-gallon elevated water storage tank including surface preparation, blasting, painting, and miscellaneous repairs and welding. Neither the Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than directly from the Engineer. The owner reserves the right to waive any informalities or to reject any or all bids. Bidders may not withdraw their bids within 30 days after the date of bid opening and must provide bid bonds as required. All bidding processes shall be in accordance with State law. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. No interpretation of the meaning of the plans, specifications, drawings and other contract documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to Glen Spears, P.E., Spears Engineering Company at glen@spearsengineering.com, cc:office@spearsengineering.com, or 3605 Jefferson Ave., Texarkana, AR 71854 and, to be given consideration, must be received at least five days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instruction will be in the form of written addenda to the contract documents which, if issued, will be emailed with return receipt requested to all prospective bidders (at the respective addresses furnished for such purposes), not later than three days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the contract documents Question Deadline 08/03/2023

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.