Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 8, 2023
September 7, 2023
February 4, 2024
To Be Determined
Renovation
No Information to Display
$261,500.00
Public - City
To Be Determined, Emmet, AR
**As of August 21, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The scope of work consists of furnishing all materials, labor, and all activities required for the repainting of the existing 50,000-gallon elevated water storage tank including surface preparation, blasting, painting, and miscellaneous repairs and welding. Neither the Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than directly from the Engineer. The owner reserves the right to waive any informalities or to reject any or all bids. Bidders may not withdraw their bids within 30 days after the date of bid opening and must provide bid bonds as required. All bidding processes shall be in accordance with State law. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. No interpretation of the meaning of the plans, specifications, drawings and other contract documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to Glen Spears, P.E., Spears Engineering Company at glen@spearsengineering.com, cc:office@spearsengineering.com, or 3605 Jefferson Ave., Texarkana, AR 71854 and, to be given consideration, must be received at least five days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instruction will be in the form of written addenda to the contract documents which, if issued, will be emailed with return receipt requested to all prospective bidders (at the respective addresses furnished for such purposes), not later than three days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the contract documents Question Deadline 08/03/2023
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Harrisburg, AR
Bid Date: Dec 01 2022
Little Rock, AR
Bid Date: Feb 19 2020
Hope, AR
Bid Date: Jul 12 2023
Pine Bluff, AR
Bid Date: Jul 28 2023
De Queen, AR
Bid Date: Aug 15 2023
Oak Grove, AR
Bid Date: Aug 16 2023
Fayetteville, AR
--
Centerton, AR
--
Little Rock, AR
Bid Date: Jul 31 2023
Rogers, AR
Bid Date: Aug 16 2023
Camden, AR
Bid Date: Aug 15 2023
Hot Springs National Park, AR
Bid Date: Aug 17 2023
Little Rock, AR
--
Marianna, AR
Bid Date: Jul 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
