Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

April 1, 2024

May 30, 2025

3701 Point Betsie Rd

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

3701 Point Betsie Rd, Frankfort, MI

Subscribe to View Full Documents

Site Directions: 3701 Point Betsie Road, Frankfort, Michigan 49635 The Project consists of improvements to the shoreline protection system that separates the Point Betsie Light Station from Lake Michigan. The Project shall be constructed between April 01, 2024, and October 31, 2024, with final site restoration completed by no later than May 30, 2025. Owner has the majority of the funds for the construction of the Project; the remaining funds from public and private sources will be obtained based on the Bid amount. Owner intends to issue a Conditional Notice of Award to the successful Bidder within 60 days after the Bid opening and issue a final Notice of Award no later than December 31, 2023. Est. Completion Date: May 30, 2025 Questions may be directed to Peter Hinck, PE, Barr Engineering Company, 616.512.7032, phinck@barr.com. All questions about the meaning or intent of the Bidding Documents are to be submitted to Owner in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents as deemed advisable by Owner or Engineer. All questions about the meaning or intent of the Bidding Documents are to be submitted to Owner in writing. Question Deadline 07/19/2023 All bids rejected

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.