Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 12, 2023

August 11, 2023

No Information to Display

3600 Oneil Blvd

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

3600 Oneil Blvd, McKeesport, PA

Subscribe to View Full Documents

Founder's Hall Middle School Roof Replacement Roof replacement Furnishing of all necessary and required labor, materials, tools, equipment, scheduling, transportation, supervision, and the complete performance of all work School District anticipates awarding Contract within sixty (60) days of the bid opening. No bona fide bids shall be altered or withdrawn for a period of sixty (60) days after the bid opening The successful bidder must furnish the school district Performance Bond and a separate Payment Bond each in the amount of 100 percent of the bid. Successful bidders will utilize form AIA A312 to complete the Performance and Payment Bond. This project is subject to the Commonwealth of Pennsylvania, Department of Labor, and Industrys Prevailing Wage Determination. All bids shall be clearly marked with the contractors name. Whenever a contractor shall submit a bid for the performance of work and the contractor later claims a mistake, error, or omission in preparing said bid, the contractor shall, before the bids are open, make known the fact and in such case the bid shall be returned unopened, and the contractor shall lose the right to bid All questions must be written and address to the Architect above. All written questions must be received five (5) days before the bid due date. Bidders must directly reach out to the Architect and obtain a copy of the bid form. The Owner reserves the right to reject any or all bids, and/or to waive any informality, infirmity, omission, defect, irregularity and/or disqualifying error in any bid This Project consists of repairs to the envelope and partial roof replacement to the existing Middle School

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects